Engineer
Designs foundations and tie-downs, and prepares Building Code evidence if your project needs consent. We can connect you with an independent engineer, optional, at your cost.

THE TECHNICAL DETAIL
Every material, every test report, published. Here's what goes into an Expanders® building, and where your engineer, plumber and electrician come in.
THE HIDDEN BILL
A cheap unit is usually cheap because of what's missing. No insulation in the walls. Water damage behind the cladding. Loose electrical wiring. Non-compliant plumbing and improper connections. None of it shows on the quote, and all of it lands on you later. Cheapest up front doesn't mean cheapest overall.
A warranty is only worth as much as the company standing behind it. When faulty units pile up claims, suppliers stop trading and the building is yours alone.
We've repaired buildings bought from other suppliers. Leaks, failed fittings and finishes that didn't last a winter.
Production moved to an upgraded, purpose-built overseas factory with modern machinery and advanced manufacturing, building to our New Zealand specification.
The buildings have been refined and upgraded more than 16 times on real customer feedback and New Zealand conditions, including fixing issues like leaking and non-compliant materials.
4.7★ from 150+ Google reviews, 400+ buildings delivered since 2023, into 9 countries.

EXPLORE THE MATERIALS

Welded corner post, container lifting point and manufacturer's plate
MATERIAL 1 / 8
Welded steel chassis and frame. Q235A and Q355B structural steel, main sections 150 × 150mm and 100 × 150mm. Galvanised, then finished with anti-corrosion paint. All-steel construction, no timber framing.
Welded steel chassis and frame. Q235A and Q355B structural steel, main sections 150 × 150mm and 100 × 150mm. Galvanised, then finished with anti-corrosion paint. All-steel construction, no timber framing.
Factory-assembled sandwich wall panel: 16mm composite cladding (0.30mm colour-coated galvanised steel outer skin, 16mm polyurethane foam core, aluminium-foil inner layer) with a 60mm expanded polystyrene (EPS) insulation core. The wall panel assembly tested to AS/NZS 1530.3 was 75mm thick. Factory-stated thermal resistance of the 60mm EPS layer: R ≈ 1.71 m²·K/W, a layer figure, not a whole-of-wall R-value. Asbestos testing by NATA-accredited labs to AS 4964: no asbestos detected.
50mm EPS-core corrugated colour-steel roof panels at a factory-set 8.8° pitch. Optional pitched roof upgrade.
Aluminium (6063-T5) double-glazed windows with fly screens. Current window series independently tested by Intertek to AS 2047-2014, pass.
Double-glazed aluminium sliding entry door, independently tested by Intertek to AS 2047-2014, pass.
20mm PPR water pipe and tapware carrying WaterMark certification; 50mm and 110mm PVC waste. Final connection on site by an NZ Certifying Plumber / Drainlayer. Hot water system not included, so you can choose one that suits your power supply.
AS/NZS 5000.2-certified building cable. Final connection by a registered NZ electrician, who issues the Certificate of Compliance and Electrical Safety Certificate. 6 LED lights supplied.
Water- and insect-resistant magnesium composite floor with vinyl flooring as standard. SPC flooring is an optional paid upgrade.
Set up or packed down in 1–2 days. Opening out needs a minimum crew of 4 for a 20ft and 6 for a 40ft. NZ delivery usually $1,000–$4,000 depending on distance from Christchurch and site access. Typical turnaround around 4 months from order. Prices exclude transport and installation.
A low price only means something if you know what's behind it. Here's what we'd ask, and our answers.
Yes. Intertek, AS 2047-2014
Ask for the report
Yes
Ask for certificate numbers
Registered NZ electrician and Certifying Plumber
Ask who signs it off
Christchurch and Auckland
Ask for the address
Our NZ team. 3-yr structural + 1-yr fixtures
Ask who honours it if they close
An Expander arrives ready to set up, but most projects involve a few local professionals. Here's how it fits together.
Designs foundations and tie-downs, and prepares Building Code evidence if your project needs consent. We can connect you with an independent engineer, optional, at your cost.
Site plans, consent documentation, and checking planning rules such as minor-unit size limits.
Site prep, placing and opening out the unit, sealing joins. We don't install directly, but we recommend experienced installers and provide guidance and documentation.
Connects water, wastewater and your hot water system, and issues the paperwork.
Connects power and issues the Certificate of Compliance and Electrical Safety Certificate.
Confirms consent and planning requirements for your site. Talk to them before you order.
Expanders® are sold as portable buildings. If you plan to live in one full time, your council will usually treat it as a building that needs consent, and consent needs evidence that it meets the Building Code, prepared for your specific site. Planning rules are separate from building consent. Small sleepouts without a kitchen or bathroom can sometimes be exempt, but most of our units include a bathroom. Talk to your council before you order, and we'll help your team with everything we hold.
Read our consent guidance
Enter your email and we'll send you our 76-page brochure with full layouts, specs, inspiration & pricing.
No spam, unsubscribe anytime.
Not automatically. Consent depends on your council, site and how you'll use it. See Consent, explained straight above.
Possibly, but your council will usually require consent. Check with them before ordering.
Commonly concrete slab or pads, concrete, timber or steel piles, or compacted ground where permitted. An engineer or qualified contractor should confirm what your site needs.
No. You choose a system that suits your power supply, installed by a qualified tradesperson.
No. They're designed for living and built to fit inside a shipping container for cheap, easy transport.
Start with the public disclosure. For certificates held on file, email info@expanders.co.nz.